- Product description
- Accessories
Technical data IG7 Dakota Rail Working pressure from 0.5 to 2.0 bar Maximum pressure 4.5 bar Operating voltage 10,8 - 14,4 V Inlet connection ø12 mm Connections at the outlet Pre-drilled nozzles M8x1 Temperature range -20° / + 120° C Resistance 2.0 Ohm Minimum injection time 1.8 ms Open 1.70 ms* Closing 1.40 ms* Homologations E8 67R-01 4893 / 110R-00 4894
Safety instructions and warnings
Safety instructions for RAIL injector LPG CNG IG7 Dakota 2 cylinder 2.0 Ohm (successor IG3 Horizon)
1. follow the manufacturer's instructions for the installation and operation of the RAIL injector.
2 Ensure that the power supply is completely switched off before installing the injector.
3 Only use spare parts and accessories recommended by the manufacturer.
4. ensure that all connections are correctly and firmly tightened to prevent leaks.
5. regularly check the condition of the injector and, if necessary, carry out maintenance work in accordance with the manufacturer's instructions.
6. keep the injector away from flames or other sources of heat.
7. do not use the injector if it is damaged or shows signs of wear.
8 Switch off the power supply before carrying out maintenance work on the injector.
9. do not touch any live parts of the injector when the power supply is switched on.
10. keep the injector away from children and store it in a safe place.
11. observe the applicable safety regulations and provisions for the safe operation of the injector.
Manufacturer Contact information
Rail S.r.l.
Via A. Grandi, 16
42030 Vezzano Sul Crostolo (RE)
Italy
+39 0522 603 801
info@railgroup.it