- Product description
CNG line connector. Compression fitting for connecting CNG high-pressure lines in natural gas-powered vehicles.
Safety instructions and warnings
Safety instructions for cutting ring fitting for CNG power (steel line) 8mm - 8mm
- Ensure that the cutting ring fitting is suitable for the intended use.
- Before installation, check that the steel pipe and the fitting are free from damage.
- Wear suitable protective gloves during installation to avoid injury.
- Only use tools and installation materials recommended by the manufacturer.
- Ensure that the steel pipe is correctly inserted into the fitting and is firmly seated.
- Tighten the fitting to the torque specified by the manufacturer to ensure a secure connection.
- Ensure that the fitting is properly sealed to prevent leaks.
- Check the screw connection regularly for leaks or loosening.
- Avoid excessive strain or bending of the steel pipe to prevent damage.
- Carry out all maintenance and repair work in accordance with the manufacturer's instructions.