- Product description
Homologation number E20 67R-01 0973
Technical data WC01 Rail | |
Working pressure | 1.2 bar |
Maximum pressure | 450 kPa |
Operating voltage | - |
Inlet connection | ø12 mm |
Connections at the outlet | pre-drilled nozzles, d.5 |
Temperature range | -20° / + 120° C |
Resistance | 2.0 Ohm |
Minimum injection time | - |
Open | 2.4 ms* |
Close | 1.7 ms* |
* at 1.2 bar
Safety instructions and warnings
Safety instructions for AC LPG injector CNG W01 - 4 cylinders incl. mounting material:
1. assembly and installation:
- Ensure that all assembly steps are carried out in accordance with the manufacturer's instructions.
- Ensure that all necessary tools and materials are used correctly.
- Observe the correct connection and fastening of the AC injector and the mounting material.
2 Operation and use:
- Only use the product in accordance with the manufacturer's instructions.
- Regularly check the condition of the AC injector and the mounting material. If there are signs of damage or wear, these should be replaced immediately.
- Ensure that all connecting elements are firmly tightened during operation.
- Observe the permissible operating conditions such as temperature and pressure ranges.
3 Maintenance and servicing:
- Carry out regular maintenance work in accordance with the manufacturer's instructions.
- Clean the AC injector and the mounting material regularly to ensure optimum functionality.
- Ensure that all safety regulations are observed during maintenance work, particularly with regard to the power and gas supply.
4 Disposal:
- Dispose of the product in accordance with local regulations and environmental regulations.
- Disconnect the product from the electricity and gas supply before disposal.
- Follow the manufacturer's specific instructions for the disposal of the AC injector and mounting material.
Manufacturer contact information
AC S. A.
15-181 Bia?ystok
ul. 42 Pu?ku piechoty 50
tel.: +48 85 743 81 00
biuro@ac.com.pl