- Product description
- Media & Downloads
- Spare parts
- Accessories
LPG adapter ACME for Germany, Belgium, Ireland and Luxembourg.
LPG filling adapters with M10, M12, M14 and M16 connection threads are often used in conjunction with a mini refueling system, an LPG filling point that is mounted behind the vehicle's fuel filler flap. The narrow connection thread of the gas adapter allows good access to the LPG filling valve and connects it securely to the LPG tank gun.
DREHMEISTER LPG filling adapters are made exclusively from high-quality raw materials. The high processing precision of the LPG gas connectors ensures optimum fitting accuracy, tightness and safety when refueling LPG.
Internationally, there are four different connection systems at LPG filling stations - ACME, DISH, bayonet and Euronozzle. The LPG gas filling adapter ensures a secure connection between the LPG filling valve on the vehicle and the nozzle at the filling station.
Technical Data
Adapter type: ACME
Connection thread: M10x1.5
Total length: 43.5 mm
Material: Brass
Application: For refueling vehicles with liquid gas (LPG/autogas)
Compatible with: Tomasetto mini refueling, OMB mini refueling, Rotarex mini refueling, etc.
Note: LPG filling adapters with M10x1.5 connection thread are often referred to as 10mm gas adapters.
Safety instructions and warnings
Important note / warning
This adapter is only suitable for filling LPG tanks. Only use the adapter for LPG (liquefied petroleum gas) and only in accordance with the instructions provided. Only connect the adapter to approved LPG filling stations and devices. Only use suitable and compatible connections. Always wear gloves during use to prevent possible cuts and cold burns. Improper use can result in serious injury or damage. Read and follow all safety instructions and warnings. If you have any questions about safe use, contact the manufacturer or an authorized dealer.
User manual
Preparation
Before installation, check the product for completeness and possible transportation damage. Ensure that there are no sources of ignition or naked flames in the vicinity.
Wear suitable gloves at all times to avoid burns or cuts.
Check the adapter for leaks and visible damage. Caution! Incomplete or damaged LPG gas connectors must not be used!
Installation
Screw the adapter into the tank valve of your vehicle or tank by hand. Only tighten it hand-tight without using tools so as not to damage the thread. Caution! Only connect the adapter to approved LPG filling stations and devices. Only use suitable and compatible connections.
Refueling process
Connect the LPG nozzle of the filling station to the adapter in accordance with the instructions at the filling station. Ensure that the adapter is firmly and securely attached before starting the refueling process. Start the refueling process according to the instructions at the filling station and always keep an eye on the filling process. Caution! Stop the refueling process immediately if you notice any leaks.
Completing the refueling process
Stop the refueling process and disconnect the nozzle from the adapter. Carefully unscrew the adapter from the tank valve and stow it away safely.
After refueling
Check the valve for possible damage (e.g. to the seal or the thread). Store the adapter in a clean and safe place.
Cleaning and care
Clean the adapter regularly to prevent dirt from accumulating. Check the adapter regularly for wear or damage. Replace the adapter if there is visible damage or signs of wear. Safety note: Only use the adapter for its intended purpose and follow all applicable safety regulations for LPG refueling operations.
Contact

