DREHMEISTER ACME LPG Adapter M10 - 80mm
DREHMEISTER ACME LPG Adapter M10 - 80mm
DREHMEISTER ACME LPG Adapter M10 - 80mm
DREHMEISTER ACME LPG Adapter M10 - 80mm
DREHMEISTER ACME LPG Adapter M10 - 80mm
DREHMEISTER ACME LPG Adapter M10 - 80mm
DREHMEISTER ACME LPG Adapter M10 - 80mm
DREHMEISTER ACME LPG Adapter M10 - 80mm

DREHMEISTER ACME LPG Adapter M10 - 80mm

Article no.: 101160
Manufacturer: DREHMEISTER®

Offer is exclusively for commercial customers. Prices are only visible after login.

Variants:
  • Product description
  • Media & Downloads
  • Spare parts
  • Accessories

LPG adapter ACME for Germany, Belgium, Ireland and Luxembourg.

LPG filling adapters with M10, M12, M14 and M16 connection threads are often used in conjunction with a mini refuelling system, an LPG filling point that is mounted behind the vehicle's fuel filler flap. The narrow connection thread of the gas adapter allows good access to the LPG filling valve and connects it securely to the LPG refuelling gun.

DREHMEISTER LPG filling adapters are made exclusively from high-quality raw materials. The high processing precision of the LPG gas connectors ensures optimum fitting accuracy, tightness and safety when refuelling with LPG.

Internationally, there are four different connection systems at LPG filling stations - ACME, DISH, bayonet and Euronozzle. The LPG gas filling adapter ensures a secure connection between the LPG filling valve on the vehicle and the nozzle at the petrol station.

Technical Data

Adapter type: ACME

Connection thread: M10x1.5

Total length: 79 mm

Material: Brass

Application: For refuelling vehicles with liquid gas (LPG/autogas)

Compatible with: Tomasetto mini refuelling, OMB mini refuelling, Rotarex mini refuelling, etc.

Note: LPG filling adapters with M10x1.5 connection thread are often referred to as 10mm gas adapters.

Safety instructions and warnings

Important note / warning

This adapter is only suitable for filling LPG tanks. Only use the adapter for LPG (liquefied petroleum gas) and only in accordance with the instructions provided. Only connect the adapter to approved LPG refuelling stations and devices. Only use suitable and compatible connections. Always wear gloves during use to prevent possible cuts and cold burns. Improper use can result in serious injury or damage. Read and follow all safety instructions and warnings. If you have any questions about safe use, contact the manufacturer or an authorised dealer.

Preparation

Before installation, check the product for completeness and possible transport damage. Ensure that there are no sources of ignition or naked flames in the vicinity.
Wear suitable gloves at all times to avoid burns or cuts.
Check the adapter for leaks and visible damage. Caution! Incomplete or damaged LPG gas connectors must not be used!

Installation

Screw the adapter into the tank valve of your vehicle or tank by hand. Only tighten it hand-tight without using tools so as not to damage the thread. Caution! Only connect the adapter to authorised LPG filling stations and devices. Only use suitable and compatible connections.

Refuelling process

Connect the LPG nozzle of the petrol pump to the adapter in accordance with the instructions at the petrol station. Ensure that the adapter is firmly and securely attached before starting the refuelling process. Start the refuelling process according to the petrol station's instructions and always keep an eye on the filling process. Caution! Stop the refuelling process immediately if you notice any leaks.

Completing the refuelling process

Stop the refuelling process and disconnect the nozzle from the adapter.
Carefully unscrew the adapter from the fuelling valve and stow it away safely.

After refuelling

Check the valve for possible damage (e.g. to the seal or the thread). Store the adapter in a clean and safe place.

Cleaning and care

Clean the adapter regularly to prevent dirt from accumulating.
Check the adapter regularly for wear or damage. Replace the adapter if there is visible damage or signs of wear.
Safety note: Only use the adapter for its intended purpose and follow all applicable safety regulations for LPG refuelling operations.



Manufacturer contact information

Manufacturer:

HybridSupply GmbH

Roggenhorsterstr. 9b

23556 Lübeck, Germany

https://hybrid.supply/contact

Subscribe to our newsletter
Our newsletter is free of charge and can be canceled at any time here or in your customer account.